Skip to content

Akkerman

+1 (800) 533.0386
  • About
    • Overview & History
    • Team
    • Supporting Community
  • Methods
    • View All Methods
    • Pilot Tube
      • Pilot Tube Microtunneling
      • Guided Auger Boring
      • Guided Pipe Ramming
      • Guided Pipe Reaming
    • Microtunneling
      • Slurry Microtunneling
      • Pilot Tube Microtunneling
    • Auger Boring
      • Guided Auger Boring
      • Rock Boring
    • Pipe Jacking & Utility Tunneling
      • Tunnel Boring
      • Shield Tunneling
      • Earth Pressure Balance
      • Hand Mining
    • Rehabilitation
      • Sliplining
      • Slip Jacking
  • Equipment
    • View All Equipment
    • Guided Boring
    • Slurry Microtunneling
    • Pipe Jacking & Utility Tunneling
    • Sliplining
    • Lubrication Systems
    • Support Equipment
  • Applications
    • Water & Sewer
    • Road, Rail, Runway Crossings
    • Oil & Gas
    • Electric & Telecom
    • Engineered Solutions
  • Resources
    • News
    • Case Studies
    • Newsletters
    • Literature and Manuals
    • Sales and Leasing
    • Financing
    • Testimonials
    • FAQ
    • Careers
  • Parts & Services
  • Contact
  • About
    • Overview & History
    • Team
    • Supporting Community
  • Methods
    • View All Methods
    • Pilot Tube
      • Pilot Tube Microtunneling
      • Guided Auger Boring
      • Guided Pipe Ramming
      • Guided Pipe Reaming
    • Microtunneling
      • Slurry Microtunneling
      • Pilot Tube Microtunneling
    • Auger Boring
      • Guided Auger Boring
      • Rock Boring
    • Pipe Jacking & Utility Tunneling
      • Tunnel Boring
      • Shield Tunneling
      • Earth Pressure Balance
      • Hand Mining
    • Rehabilitation
      • Sliplining
      • Slip Jacking
  • Equipment
    • View All Equipment
    • Guided Boring
    • Slurry Microtunneling
    • Pipe Jacking & Utility Tunneling
    • Sliplining
    • Lubrication Systems
    • Support Equipment
  • Applications
    • Water & Sewer
    • Road, Rail, Runway Crossings
    • Oil & Gas
    • Electric & Telecom
    • Engineered Solutions
  • Resources
    • News
    • Case Studies
    • Newsletters
    • Literature and Manuals
    • Sales and Leasing
    • Financing
    • Testimonials
    • FAQ
    • Careers
  • Parts & Services
  • Contact
Case Studies

Case Studies

Home / Case Studies

Case Studies

Filter by:

Guided Auger Boring (8) Guided Pipe Ramming (4) Guided Pull-Back (2) Guided Rock Boring (1) Pilot Tube Microtunneling (9) Pipe Ramming (2) Pipe Roofing (1) Rock Boring (5) Shield Excavator (1) Sliplining (5) Slurry Microtunneling (23) TBM - Rock (3) TBM - Standard (8)
Guided Auger Boring
Aerial view of a trenchless construction site with excavated pits, equipment, and vehicles along a rural roadway surrounded by farm fields.
May 15, 2026

South Sarpy County Regional WastewaterSystem Phase 1A – Segment 3

Read More →
Guided Auger Boring
Airport Pipeline Project – 240A GBM, P4075D Power Pack, Guidance System, Lube System, 20-in. WORH Adapter
May 21, 2025

Airport Pipeline Project – 240A GBM, P4075D Power Pack, Guidance System, Lube System, 20-in. WORH Adapter

Read More →
Guided Auger Boring
GBM Tooling Options for Guided Auger Boring – 240A, WORH, GRS, Bearing Swivels
February 9, 2024

GBM Tooling Options for Guided Auger Boring – 240A, WORH, GRS, Bearing Swivels

Read More →
Guided Auger Boring
Auger Boring in Colorado – Article written by Stefan Johnson – May 2023 in Trenchless Technology
February 9, 2024

Auger Boring in Colorado – Article written by Stefan Johnson – May 2023 in Trenchless Technology

Read More →
Guided Auger Boring
On Time, On Line, and On Budget – Written by Jim Wiest – May 2023 in Trenchless Technology
February 9, 2024

On Time, On Line, and On Budget – Written by Jim Wiest – May 2023 in Trenchless Technology

Read More →
Guided Auger Boring
Achieving Accurate Auger Boring – Written by Laura Anderson – Trenchless Technology – Aug. 2023
February 9, 2024

Achieving Accurate Auger Boring – Written by Laura Anderson – Trenchless Technology – Aug. 2023

Read More →
Guided Auger Boring
DFW Runway 17C-35C Rehabilitation Project – GBM 240A Jacking Frame & Guidance System
February 8, 2024

DFW Runway 17C-35C Rehabilitation Project – GBM 240A Jacking Frame & Guidance System

Read More →
Guided Auger Boring
Accelerated Water Meter Program, River Park Neighborhood – GBM 240 Jacking Frame, Guidance System
February 8, 2024

Accelerated Water Meter Program, River Park Neighborhood – GBM 240 Jacking Frame, Guidance System

Read More →

Join our Newsletter

Sign Up

Join our Team

View all current openings

+1 (800) 533.0386

58256 266th Street | Brownsdale, MN 55918


Copyright © 2026 Akkerman, Inc. – All Rights Reserved.
Website by Central States Marketing