Miscellaneous Archives - Page 2 of 2 - Akkerman

Miscellaneous

Akkerman Inc.
Showing:

City of Phoenix Supports $12B Microchip Facility With Fast-Tracked Water Infrastructure Enhancements

An image of a TBM system being used by SSC Underground was featured in a recent article from Engineering News-Record. The city of Phoenix is constructing new water and wastewater infrastructure to support a microchip facility being built on the north side of the valley for the Taiwan Semiconductor Manufacturing Co. (TSMC). This facility will […]

Read More

Sydney’s forgotten ghost tunnels all powered up with guided boring breakthrough

Akkerman was recently featured in a Trenchless Australasia article. Directhitt Trenchless has completed a project for Laing O’Rourke at Sydney’s Central Station by installing critical electrical infrastructure for the new Sydney Metro. As part of the biggest upgrade to Sydney’s busiest railway station in decades, Directhitt Trenchless were contracted to supply and install four DN […]

Read More

Digger Deeper – March 2022

Guided Auger Boring Set-up Guided Auger Boring is rapidly becoming one of the most popular and cost-effective trenchless methods to accurately install steel casing for underground utilities.  Contractors around the world have utilized industry advancements in both guided boring as well as auger boring technology to successfully complete projects that were not possible just a […]

Read More