Project Overview
Minger Construction completed tunnel boring operations for the 2025 Design Road and TH 371 Stormwater Improvements project in Baxter, Minnesota. The project required installation of a 60-in reinforced concrete stormwater tunnel beneath a high-traffic highway corridor.
The trenchless installation enabled uninterrupted traffic flow along a major regional route while supporting critical drainage infrastructure improvements. Operating in sandy and granular soils, the crew utilized TBM methods to maintain controlled excavation and alignment beneath the roadway.