2025 Design Road & TH 371 Stormwater Improvements

Project Name
2025 Design Road & TH 371 Stormwater Improvements
General Contractor
Minger Construction – Jordan, MN
Location
Baxter, MN
Ground Conditions
Sand and gravel with sand shelves
Akkerman Equipment
5200 Pump Unit with Series I 660 TBM
Pipe
60-in Reinforced Concrete Pipe (RCP)
Total Length/Hard Rock Section
144 LF
Owner
Minnesota Department of Transportation

Project Overview

Minger Construction completed tunnel boring operations for the 2025 Design Road and TH 371 Stormwater Improvements project in Baxter, Minnesota. The project required installation of a 60-in reinforced concrete stormwater tunnel beneath a high-traffic highway corridor.

The trenchless installation enabled uninterrupted traffic flow along a major regional route while supporting critical drainage infrastructure improvements. Operating in sandy and granular soils, the crew utilized TBM methods to maintain controlled excavation and alignment beneath the roadway.

Challenges

  • Excavating in sand and gravel conditions with limited natural cohesion
  • Maintaining ground stability using sand shelf techniques
  • Performing installation beneath a high-traffic highway corridor
  • Delivering efficient production within a constrained schedule

Solution

  • Utilized the Akkerman 5200 Pump Unit with Series I 660 TBM for controlled excavation
  • Implemented sand shelves to stabilize excavation in granular soils
  • Maintained precise line and grade control throughout the installation
  • Applied efficient tunneling practices to accelerate production and minimize disruption

Outcome

  • Successfully completed the 144 LF stormwater tunnel installation
  • Maintained accurate alignment beneath TH 371
  • Achieved stable excavation performance in sandy, granular conditions
  • Completed installation efficiently within a limited schedule
  • Enabled improved stormwater management infrastructure while maintaining traffic flow