Skip to content

Akkerman

+1 (800) 533.0386
  • About
    • Overview & History
    • Team
    • Supporting Community
  • Methods
    • View All Methods
    • Pilot Tube
      • Pilot Tube Microtunneling
      • Guided Auger Boring
      • Guided Pipe Ramming
      • Guided Pipe Reaming
    • Microtunneling
      • Slurry Microtunneling
      • Pilot Tube Microtunneling
    • Auger Boring
      • Guided Auger Boring
      • Rock Boring
    • Pipe Jacking & Utility Tunneling
      • Tunnel Boring
      • Shield Tunneling
      • Earth Pressure Balance
      • Hand Mining
    • Rehabilitation
      • Sliplining
      • Slip Jacking
  • Equipment
    • View All Equipment
    • Guided Boring
    • Slurry Microtunneling
    • Pipe Jacking & Utility Tunneling
    • Sliplining
    • Lubrication Systems
    • Support Equipment
  • Applications
    • Water & Sewer
    • Road, Rail, Runway Crossings
    • Oil & Gas
    • Electric & Telecom
    • Engineered Solutions
  • Resources
    • News
    • Case Studies
    • Newsletters
    • Literature and Manuals
    • Sales and Leasing
    • Financing
    • Testimonials
    • FAQ
    • Careers
  • Parts & Services
  • Contact
  • About
    • Overview & History
    • Team
    • Supporting Community
  • Methods
    • View All Methods
    • Pilot Tube
      • Pilot Tube Microtunneling
      • Guided Auger Boring
      • Guided Pipe Ramming
      • Guided Pipe Reaming
    • Microtunneling
      • Slurry Microtunneling
      • Pilot Tube Microtunneling
    • Auger Boring
      • Guided Auger Boring
      • Rock Boring
    • Pipe Jacking & Utility Tunneling
      • Tunnel Boring
      • Shield Tunneling
      • Earth Pressure Balance
      • Hand Mining
    • Rehabilitation
      • Sliplining
      • Slip Jacking
  • Equipment
    • View All Equipment
    • Guided Boring
    • Slurry Microtunneling
    • Pipe Jacking & Utility Tunneling
    • Sliplining
    • Lubrication Systems
    • Support Equipment
  • Applications
    • Water & Sewer
    • Road, Rail, Runway Crossings
    • Oil & Gas
    • Electric & Telecom
    • Engineered Solutions
  • Resources
    • News
    • Case Studies
    • Newsletters
    • Literature and Manuals
    • Sales and Leasing
    • Financing
    • Testimonials
    • FAQ
    • Careers
  • Parts & Services
  • Contact
Case Studies

Case Studies

Home / Case Studies

Case Studies

Filter by:

Guided Auger Boring (15) Guided Pipe Ramming (6) Guided Pull-Back (2) Guided Rock Boring (1) Pilot Tube Microtunneling (10) Pipe Ramming (2) Pipe Roofing (1) Rock Boring (5) Shield Excavator (1) Sliplining (5) Slurry Microtunneling (29) TBM - Rock (4) TBM - Standard (13)
TBM - Standard
Interior of the WHCRWA-6 tunnel showing steel ring beams and lagging
November 5, 2026

WHCRWA-6 Project

Read More →
TBM - Standard
Construction crew with tunnel boring equipment in the Denver International Airport taxiway excavation
November 5, 2026

Taxiway DS East–West Gates Tie-In Project

Read More →
Slurry Microtunneling
Slurry microtunneling machine positioned in the Lake Elmo sewer expansion launch shaft
November 5, 2026

Regional Sewer Expansion: Lake Elmo West Project

Read More →
Guided Auger Boring
Akkerman guided boring equipment operating in the K-10 utility relocation excavation
November 5, 2026

K-10 Utility Relocations

Read More →
Guided Auger Boring
Aerial view of the First Creek Interceptor construction site with a crane beside the excavation
November 5, 2026

First Creek Interceptor Project

Read More →
TBM - Rock
Tunnel boring equipment in a launch shaft for the Fayetteville West Transmission Main
November 5, 2026

Fayetteville West Transmission Main

Read More →
Slurry Microtunneling
Crew handling the slurry microtunneling machine at the Aurora raw water intake project
November 5, 2026

Aurora Raw Water Intake Project

Read More →
TBM - Standard
Aerial view of the Design Road and TH 371 stormwater tunnel construction site beside the highway
November 5, 2026

2025 Design Road & TH 371 Stormwater Improvements

Read More →
Guided Pipe Ramming
Pilot tube assisted pipe ramming equipment and crew at the 1800 North Sewer Realignment project
November 5, 2026

1800 N. Sewer Realignment – Phase 1

Read More →
Pilot Tube Microtunneling
Westridge Lift Station Project
August 20, 2026

Westridge Lift Station Project

Read More →
TBM - Standard
US-401 & Ligon Mill Rd Improvements
August 20, 2026

US-401 & Ligon Mill Rd Improvements

Read More →
Slurry Microtunneling
Pleasant Run Microtunnel Project
August 20, 2026

Pleasant Run Microtunnel Project

Read More →

Posts navigation

1 2 3 … 8 Next »

Join our Newsletter

Sign Up

Join our Team

View all current openings

+1 (800) 533.0386

58256 266th Street | Brownsdale, MN 55918


Copyright © 2026 Akkerman, Inc. – All Rights Reserved.
Website by Central States Marketing