Nicollet Mall Sanitary Sewer Replacement, Phase 1 & 2 – GBM 4800 Jacking Frames, Guidance Systems, PCH 20 Cutter Head

Project Name
Nicollet Mall Sanitary Sewer Replacement, Phase 1 & 2
General Contractor
Minger Construction, Inc.
Location
Minneapolis, MN
Ground Conditions
Cobbles, Granular Materials
Akkerman Equipment
GBM 4800 Jacking Frames, Guidance Systems, PCH 20 Cutter Head
Pipe
30-in. Steel Casing, 12, 15 & 18-in. ID NO- DIG® Vitrified Clay Pipe, 2m joints
Total Length/Hard Rock Section
1,800-lf./425-lf.
Owner
City of Minneapolis Public Works

Project Overview

The City of Minneapolis’s sewer system was originally constructed in the 1890s and in need of capacity upgrades and new extensions as part of the Nicollet Mall re-imaging effort in the heart of downtown. The highly urbanized region had many subsurface utilities and above ground buildings and structures.

Challenges

• Need to preserve live traffic and public access to businesses

• Construction around existing structures and landscaping

• Line and grade accuracy was necessary to circumvent many existing buried utilities

• Varying ground up to 20-ft. depths with pockets of cobble

• Minimal space for construction equipment and pipe staging

• Installation conducted during cold winter months

• Need for carefully phased construction planning and communication with project team

Outcome

• Successfully installed 1,800-lf. of sewer alignments in nine runs at up to 20-ft. depths

• Completed ahead of schedule and under budget