Skip to content

Akkerman

+1 (800) 533.0386
  • About
    • Overview & History
    • Team
    • Supporting Community
  • Methods
    • View All Methods
    • Pilot Tube
      • Pilot Tube Microtunneling
      • Guided Auger Boring
      • Guided Pipe Ramming
      • Guided Pipe Reaming
    • Microtunneling
      • Slurry Microtunneling
      • Pilot Tube Microtunneling
    • Auger Boring
      • Guided Auger Boring
      • Rock Boring
    • Pipe Jacking & Utility Tunneling
      • Tunnel Boring
      • Shield Tunneling
      • Earth Pressure Balance
      • Hand Mining
    • Rehabilitation
      • Sliplining
      • Slip Jacking
  • Equipment
    • View All Equipment
    • Guided Boring
    • Slurry Microtunneling
    • Pipe Jacking & Utility Tunneling
    • Sliplining
    • Lubrication Systems
    • Support Equipment
  • Applications
    • Water & Sewer
    • Road, Rail, Runway Crossings
    • Oil & Gas
    • Electric & Telecom
    • Engineered Solutions
  • Resources
    • News
    • Case Studies
    • Newsletters
    • Literature and Manuals
    • Sales and Leasing
    • Financing
    • Testimonials
    • FAQ
    • Careers
  • Parts & Services
  • Contact
  • About
    • Overview & History
    • Team
    • Supporting Community
  • Methods
    • View All Methods
    • Pilot Tube
      • Pilot Tube Microtunneling
      • Guided Auger Boring
      • Guided Pipe Ramming
      • Guided Pipe Reaming
    • Microtunneling
      • Slurry Microtunneling
      • Pilot Tube Microtunneling
    • Auger Boring
      • Guided Auger Boring
      • Rock Boring
    • Pipe Jacking & Utility Tunneling
      • Tunnel Boring
      • Shield Tunneling
      • Earth Pressure Balance
      • Hand Mining
    • Rehabilitation
      • Sliplining
      • Slip Jacking
  • Equipment
    • View All Equipment
    • Guided Boring
    • Slurry Microtunneling
    • Pipe Jacking & Utility Tunneling
    • Sliplining
    • Lubrication Systems
    • Support Equipment
  • Applications
    • Water & Sewer
    • Road, Rail, Runway Crossings
    • Oil & Gas
    • Electric & Telecom
    • Engineered Solutions
  • Resources
    • News
    • Case Studies
    • Newsletters
    • Literature and Manuals
    • Sales and Leasing
    • Financing
    • Testimonials
    • FAQ
    • Careers
  • Parts & Services
  • Contact
Pilot Tube Microtunneling

Pilot Tube Microtunneling

Home / Pilot Tube Microtunneling

Pilot Tube Microtunneling

Case Studies
Aerial view of a trenchless construction site with two excavation pits, equipment, and vehicles along a roadway.
May 15, 2026

Des Moines WRA Ingersoll Run Outlet Sewer Segment 1

Read More →
Case Studies
Construction crew standing behind microtunneling equipment at an active trenchless construction site.
May 15, 2026

Green River & Chatwood Lift Station

Read More →
Case Studies
Empire State Trail Box Tunnel – 240A GBM System, Guidance System, Lube System, Pull-back Adapters
May 21, 2025

Empire State Trail Box Tunnel – 240A GBM System, Guidance System, Lube System, Pull-back Adapters

Read More →
Case Studies
Nicollet Mall Sanitary Sewer Replacement, Phase 1 & 2 – GBM 4800 Jacking Frames, Guidance Systems, PCH 20 Cutter Head
February 9, 2024

Nicollet Mall Sanitary Sewer Replacement, Phase 1 & 2 – GBM 4800 Jacking Frames, Guidance Systems, PCH 20 Cutter Head

Read More →
Case Studies
Sewer Group 786 – GBM 240A Jacking Frame, Guidance System, Casing and Auger Assemblies
February 9, 2024

Sewer Group 786 – GBM 240A Jacking Frame, Guidance System, Casing and Auger Assemblies

Read More →
Case Studies
Grand River Ave. 10-in. Sanitary Sewer – GBM 339A Jacking Frame & Guidance System
February 9, 2024

Grand River Ave. 10-in. Sanitary Sewer – GBM 339A Jacking Frame & Guidance System

Read More →
Case Studies
Shively Interceptor – GBM 308 & 4800 Jacking Frames & PCH 20
February 9, 2024

Shively Interceptor – GBM 308 & 4800 Jacking Frames & PCH 20

Read More →
Case Studies
Hennepin Avenue Sanitary Sewer, 5th to 7th Street – GBM 4800 Jacking Frame & Guidance System
February 9, 2024

Hennepin Avenue Sanitary Sewer, 5th to 7th Street – GBM 4800 Jacking Frame & Guidance System

Read More →
Case Studies
Chanate/Mendocino Area Sewer Replacement, North Trunk Sewer Project – GBM 4800 Jacking Frame, Guidance System, Casing and Auger Assemblies
February 9, 2024

Chanate/Mendocino Area Sewer Replacement, North Trunk Sewer Project – GBM 4800 Jacking Frame, Guidance System, Casing and Auger Assemblies

Read More →

Join our Newsletter

Sign Up

Join our Team

View all current openings

+1 (800) 533.0386

58256 266th Street | Brownsdale, MN 55918


Copyright © 2026 Akkerman, Inc. – All Rights Reserved.
Website by Central States Marketing