Project Overview
Dunigan Bros., Inc. completed a guided auger boring installation for a gas distribution project in Hamilton, Michigan. The project required placement of a 4-in gas main using a non-HDD trenchless method to meet permitting requirements while maintaining precise line and grade control.
By utilizing the Akkerman 240A GBM System, the crew installed pilot tubes and completed the installation with controlled accuracy. The guided auger boring approach provided an efficient alternative method while supporting reliable gas utility placement.