Project Overview
Minger Construction completed guided auger boring operations as part of the East Gull Lake Wastewater Treatment Plant Facility Improvements project in Minnesota. The installation required multiple short drives to accommodate a water forcemain while minimizing surface disruption in a constrained project area.
Utilizing the Akkerman 4800C GBM System, the crew installed pilot bores and casing with precision, supporting efficient placement of the forcemain carrier pipe. The project played a key role in upgrading local wastewater infrastructure while maintaining accessibility within a high-use recreational area.