Fayetteville West Transmission Main

Project Name
Fayetteville West Transmission Main
General Contractor
Minger Construction Co., Inc. – Jordan, MN
Location
Fayetteville, AR
Ground Conditions
Solid limestone with compressive strengths up to 15,000 PSI
Akkerman Equipment
5200 Pump Unit with Series II 600 TBM. Rock-face cutterhead configuration
Pipe
72-in steel casing
Total Length/Hard Rock Section
600 LF
Owner
Municipal Water Authority

Project Overview

Minger Construction completed tunnel boring operations for the Fayetteville West Transmission Main project in Fayetteville, Arkansas. The project required installation of a 72-in steel casing beneath Clear Creek to support a water transmission line.

Operating in highly competent limestone, the crew utilized a rock tunnel boring machine to maintain controlled excavation and alignment. The installation demonstrated the effectiveness of TBM-based trenchless methods for long drives in hard rock conditions.

Challenges

  • Excavating through solid limestone with compressive strengths up to 15,000 PSI
  • Maintaining line and grade accuracy in hard rock conditions
  • Performing installation beneath Clear Creek with limited tolerance for deviation
  • Managing consistent production rates in highly abrasive material

Solution

  • Utilized the Akkerman Series II 600 TBM with rock cutting head to effectively excavate limestone
  • Deployed the 5200 Pump Unit to provide controlled thrust and consistent pipe advancement
  • Maintained precise guidance and alignment throughout the installation
  • Applied rock tunneling methods designed for high-strength, abrasive ground conditions

Outcome

  • Successfully completed the 600 LF tunnel installation beneath Clear Creek
  • Maintained accurate line and grade control through solid limestone
  • Achieved consistent excavation performance in high-strength rock conditions
  • Enabled installation of critical water transmission infrastructure
  • Demonstrated reliable TBM performance in demanding rock tunneling applications