Project Overview
Minger Construction completed tunnel boring operations for the Fayetteville West Transmission Main project in Fayetteville, Arkansas. The project required installation of a 72-in steel casing beneath Clear Creek to support a water transmission line.
Operating in highly competent limestone, the crew utilized a rock tunnel boring machine to maintain controlled excavation and alignment. The installation demonstrated the effectiveness of TBM-based trenchless methods for long drives in hard rock conditions.