Project Overview
Dewrell Horizontal Road Boring Inc. completed guided auger boring operations for a roadway crossing project in Greenville, Georgia. With extensive regional experience in varying subsurface conditions, the crew integrated Akkerman’s guided auger boring technology to enhance accuracy and efficiency during installation.
The project required precise alignment control beneath the roadway while working in cohesive clay soils. By leveraging guided boring technology, the crew achieved consistent performance and minimized surface disruption during installation.