Project Overview
Rising Sun Inc. completed guided auger boring operations for a waterline crossing beneath I-95 in Stafford County, Virginia. The project required precise installation of a 42-in steel casing over an extended drive length while maintaining strict alignment tolerances beneath a major transportation corridor.
Utilizing the Akkerman 240A GBM System in conjunction with an auger boring machine, the crew achieved accurate line and grade control throughout the installation. The project marked a successful application of guided auger boring technology in high-profile infrastructure crossing conditions.