Project Overview
AR Daniel Construction Services completed earth pressure balance (EPB) tunnel boring operations for the WHCRWA-6 Project in Katy, Texas. The installation required construction of a 96-in diameter tunnel to support a major surface water conveyance system serving the region.
Operating in variable clay soils with sand seams, the crew utilized EPB tunneling methods to maintain face stability and control material flow. The installation contributes to a broader system designed to deliver surface water to regional treatment facilities and support long-term water supply needs.