Skip to content

Akkerman

+1 (800) 533.0386
  • About
    • Overview & History
    • Team
    • Supporting Community
  • Methods
    • View All Methods
    • Pilot Tube
      • Pilot Tube Microtunneling
      • Guided Auger Boring
      • Guided Pipe Ramming
      • Guided Pipe Reaming
    • Microtunneling
      • Slurry Microtunneling
      • Pilot Tube Microtunneling
    • Auger Boring
      • Guided Auger Boring
      • Rock Boring
    • Pipe Jacking & Utility Tunneling
      • Tunnel Boring
      • Shield Tunneling
      • Earth Pressure Balance
      • Hand Mining
    • Rehabilitation
      • Sliplining
      • Slip Jacking
  • Equipment
    • View All Equipment
    • Guided Boring
    • Slurry Microtunneling
    • Pipe Jacking & Utility Tunneling
    • Sliplining
    • Lubrication Systems
    • Support Equipment
  • Applications
    • Water & Sewer
    • Road, Rail, Runway Crossings
    • Oil & Gas
    • Electric & Telecom
    • Engineered Solutions
  • Resources
    • News
    • Case Studies
    • Newsletters
    • Literature and Manuals
    • Sales and Leasing
    • Financing
    • Testimonials
    • FAQ
    • Careers
  • Parts & Services
  • Contact
  • About
    • Overview & History
    • Team
    • Supporting Community
  • Methods
    • View All Methods
    • Pilot Tube
      • Pilot Tube Microtunneling
      • Guided Auger Boring
      • Guided Pipe Ramming
      • Guided Pipe Reaming
    • Microtunneling
      • Slurry Microtunneling
      • Pilot Tube Microtunneling
    • Auger Boring
      • Guided Auger Boring
      • Rock Boring
    • Pipe Jacking & Utility Tunneling
      • Tunnel Boring
      • Shield Tunneling
      • Earth Pressure Balance
      • Hand Mining
    • Rehabilitation
      • Sliplining
      • Slip Jacking
  • Equipment
    • View All Equipment
    • Guided Boring
    • Slurry Microtunneling
    • Pipe Jacking & Utility Tunneling
    • Sliplining
    • Lubrication Systems
    • Support Equipment
  • Applications
    • Water & Sewer
    • Road, Rail, Runway Crossings
    • Oil & Gas
    • Electric & Telecom
    • Engineered Solutions
  • Resources
    • News
    • Case Studies
    • Newsletters
    • Literature and Manuals
    • Sales and Leasing
    • Financing
    • Testimonials
    • FAQ
    • Careers
  • Parts & Services
  • Contact
Slurry Microtunneling

Slurry Microtunneling

Home / Slurry Microtunneling

Slurry Microtunneling

Case Studies
Slurry microtunneling machine positioned in the Lake Elmo sewer expansion launch shaft
November 5, 2026

Regional Sewer Expansion: Lake Elmo West Project

Read More →
Case Studies
Aerial view of the First Creek Interceptor construction site with a crane beside the excavation
November 5, 2026

First Creek Interceptor Project

Read More →
Case Studies
Crew handling the slurry microtunneling machine at the Aurora raw water intake project
November 5, 2026

Aurora Raw Water Intake Project

Read More →
Case Studies
Pleasant Run Microtunnel Project
August 20, 2026

Pleasant Run Microtunnel Project

Read More →
Case Studies
Copper Creek Sewer Interceptor Relocation
August 20, 2026

Copper Creek Sewer Interceptor Relocation

Read More →
Case Studies
Boulder MSI Improvements
August 20, 2026

Boulder MSI Improvements

Read More →
Case Studies
Large circular excavation shaft with microtunneling equipment being lowered by crane at a construction site.
May 15, 2026

Sims Bayou Microtunnel Project

Read More →
Case Studies
Crane lowering tunneling equipment into a circular excavation shaft at an urban microtunneling construction site.
May 15, 2026

Cottonwood & Hackberry Creek WW Interceptor Improvements

Read More →
Case Studies
Kaw Lake Water Supply – SL74P MTBM System, AZ-100 Total Guidance System, 800-ton MT Jacking Frame, High Pressure Pit Seal & Pipe Clamp
May 21, 2025

Kaw Lake Water Supply – SL74P MTBM System, AZ-100 Total Guidance System, 800-ton MT Jacking Frame, High Pressure Pit Seal & Pipe Clamp

Read More →
Case Studies
Aurora Gun Club Rd. Microtunneling Project – Akkerman SL60C MTBM Fitting with a 72-in OD Skin Kit, 800-ton Jacking Frame
May 21, 2025

Aurora Gun Club Rd. Microtunneling Project – Akkerman SL60C MTBM Fitting with a 72-in OD Skin Kit, 800-ton Jacking Frame

Read More →
Case Studies
Akk manage risk
July 22, 2024

How to Effectively Manage Risk in Microtunneling

Read More →
Case Studies
First Creek Interceptor Project (Aurora, CO) – BT Trenchless – February 2024
February 19, 2024

First Creek Interceptor Project (Aurora, CO) – BT Trenchless – February 2024

Read More →

Posts navigation

1 2 3 Next »

Join our Newsletter

Sign Up

Join our Team

View all current openings

+1 (800) 533.0386

58256 266th Street | Brownsdale, MN 55918


Copyright © 2026 Akkerman, Inc. – All Rights Reserved.
Website by Central States Marketing